Keystone Support
  • English
Go to website
Back
Articles on:Masterplan
No description

Categories

  • OPEN: Timeplanner and Procedures
  • Procedure 2.0
  • Report view
  • Masterplan
  • Execution View
  • Release Notes
  • Viewing and Editing Phases
    Masterplan receives phases from Wellcom, and these can be viewed by opening the Phases tab under the south and north installations. Each phase displays: The parent project Title Timeline (including start date, end date, and duration) Some fields are locked for editing, but you can update the following: Emission to air Logistic demFew readers
  • Export Files to Safran
    You can export your data from Masterplan to Safran. Before downloading the Safran file, you can apply filters to include only the projects you need, ensuring the export is focused and relevant. When you initiate the Safran file download, a filter form will appear where you can choose the desired filters. Available filters include: Date range (by startFew readers
  • Request Access to Masterplan
    If you or a colleague need access to Masterplan, follow these steps: Go to the Masterplan link: https://masterplan-equinor.keystone-software.tech/  Click “RequestFew readers
  • Undo and Redo Actions
    You can easily undo or redo actions you have taken in Masterplan. On the arrow icon, you will see the number of recent actions available. Undo The system allows you to undo your last 10 actions, making it easy to backtrack and correct mistakes. Actions that can be undone include: Creating a project, placeholder, note, or drill stop AssigniFew readers
  • Rig Scheduler
    Overview The Rig Scheduler view is similar to the Masterplan and includes: A search field Zoom to view timeframes of 1 year, 2 years, and 4 years. The ability to change the displayed date A fullscreen modFew readers
  • Add Notes and Drill stops
    To add notes, navigate to the Notes section for the desired location and double-click. This will open the editor, where you can add a description, start date, and duration. You can also create the note as a drill stop by toggling this option. Add the locationFew readers
  • Managing and Using Tags
    You can create your own tag groups and tags to get a personalized overview of the Masterplan. Tags allow you to categorize projects, placeholders, notes, and drill stops based on department or other criteria. Managing Tag Groups and Tags An Admin page is available for managing tag groups and tags (accessible to editors only). You can: Create, uFew readers
  • Create Masterplan Draft
    In the Drafts tab, you can create and manage drafts: a flexible space where you can freely plan, move, and edit without affecting the actual Masterplan. Once you are satisfied with your changes, you can choose to publish them. When you open the tab, you will see all drafts that are public or created by you. Creating a Draft To create a draft, simply click “CrFew readers
  • Placeholder
    To create a placeholder, simply double-click in the Gantt chart where you want it to appear (for example, GFA North or GFA South). You can add details such as slot, well, name, date, duration, POB, and additional information like maturity phase. The defauFew readers
  • Viewing of Projects
    There are two ways to view projects in Masterplan. The default and most common one is the Gantt view. Highlight project: When you have many projects, it can be hard to find the one you’re looking for. Simply type part of the project name, and any matching projects will be highlighted in the Gantt view. Zoom: Use the magnifying glass or the zoom range list to adFew readers
  • Projects
    Unscheduled projects are imported from Wellcom and listed under “Unscheduled Projects.” The list contain:  Installation Duration Category Project name Slot Additionaly:  The list is grouped by Installation. If there are no unassigned projects, you will see an informational message. The list is sorted by Slot (alpFew readers
  • Create a new project (Topside and Flowline)
    To create a new project, navigate to the Topside or Flowline section where you want to add it, and double-click to open the editor. In the editor, you can add details such as slot, well, project name, change start date, duration, and POB. If you need to make chFew readers
  • Switching Between Fields
    If you have access to multiple fields, for example Statfjord and Gullfaks, you can switch between them here.Few readers

Not finding what you are looking for?

Chat with us or send us an email.

  • Chat with us
  • Send us an email
© 2026Keystone Support