Projects
Unscheduled projects are imported from Wellcom and listed under “Unscheduled Projects.”

**The list contain: **
- Installation
- Duration
- Category
- Project name
- Slot
**Additionaly: **
- The list is grouped by Installation.
- If there are no unassigned projects, you will see an informational message.
- The list is sorted by Slot (alphabetically).
- Projects are updated from Wellcom, and Masterplan keeps the data in sync every 30 minutes.
- Projects with a start date older than 6 months are hidden.
- Projects without a start date are excluded.

Assign projects to the Masterplan
**Drag and drop a project from Unscheduled Projects to the desired location in the Masterplan. Once assigned, the editor opens. **
**The fields you can edit for projects are: **
- Project name
- Start date
- Priority
- Crew

After saving and reopening the project, you will see these tabs (in addition to General you have already seen):
- Phases
- Dependencies
- History
- Safran
- Tags
- Comments
- And for intervention projects only: INV
Phases
View a detailed list of all the project’s phases (name, start/end date, duration).
You can open a phase directly in Masterplan for more detail.

Phases come exclusively from Wellcom and cannot be edited in Masterplan.
The list is sorted by start date (oldest first).
Dependencie
In the Dependencies tab, you can add a predecessor or successor to a project.
A predecessor is a project that takes place before the one you are editing, while a successor happens after.
To add a dependency simply click “Add predecessor” or “Add successor.”

You will see a set of filters and search options to help you find the right project. You can filter by date range and crew.
- Projects are grouped by location and sorted by slot.
- Within each slot, projects are sorted by title.
- You can search by title or slot.
- You can filter by crew(s) and start date.
- By default, the list displays projects with start dates within two months before and after today’s date.

After adding a project, you will return to the editor where you can set the dependency type, lag, or delete the dependency.

Dependency types:
- End to Start: The successor starts when the predecessor ends.
- Start to Start: Both projects start at the same time.
- End to End: Both projects end at the same time.
- Start to End: The successor ends when the predecessor starts.
**Lag represents the time gap between the two projects, measured in days. You can visually see dependencies in the Gantt chart. **

If you move a predecessor, its successor will follow, keeping the chosen lag.
Dependencies can be shown or hidden as needed.

Manual start date changes are only allowed for the first project (predecessor) in a sequence. All following projects are locked until their predecessors are removed.
Projects with one or more successors cannot be unassigned. You will be prompted to delete all predecessors and successors before unassigning.
INV (intervention Projects only)
This tab appears only for intervention projects, not for rig projects.

In the INV tab, you can:
- Add project type
- Add planning duration
- Assign engineers
- Toggle Summary performed
- Add status
History
The History tab tracks all changes made to placeholder. This allows you to see who made changes, what was changed, and when.
Each record includes:
- Author name
- Action (add, update, delete)
- Entity state (before and after)
- Date and time
You can expand each record to view detailed information.

Safran
Masterplan sends information to Safran. In this tab, you can add risk, work order number, responsible, task manager, and shutdown.

You can also toggle “Reference to Masterplan” and “Reference to Operation Plan”, depending on what’s required for the project.
We have implemented rules that automatically send phase information to Safran. To ensure consistent updates, the system synchronizes data every Friday at 16:00 CET, with the following conditions:
- Only assigned phases are sent.
- Only phases from the main (applied) masterplan are included.
- Only phases from Statfjord A, B, and C are sent.
Tags
In the Tags tab, you can add tags based on groups and tags created by an admin. Tags make it easier to sort and find projects.


Comment
In the Comments tab, you can view all comments created by you or other users.
You can edit, delete, or resolve comments directly in this tab.

Updated on: 07/01/2026
Thank you!