Masterplan release Notes 2.6
This release brings several improvements focused on clarity, control, and usability in the Masterplan. Here’s what’s new:
- Meta Tags – New tagging system to visually organize and filter projects, placeholders, notes, and drill stops.
- Managing Tag Groups and Tags – Admin tools to create, edit, and delete tag groups and tags with color assignment.
- Assigning Tags to Items – Tags can be applied per group, tracked in history, and are visible in both main Masterplan and drafts.
- Color Coding by Tag Group – Masterplan view can now be colored by selected tag group.
- Update to List of INV Well Engineers – Engineer list updated with new names and removal of outdated ones.
- POB Added to Phases – POB can now be set per phase with the same validation as project-level.
- Improved Zoom Functionality – New zoom levels available: 1m, 3m, 6m, 1y, 1.5y, 2y for more precise timeline control.
Meta Tags
We have introduced a new meta tagging system in the Masterplan to improve visual clarity and categorization of projects, placeholders, notes, and drill stops based on department or other criteria.
Managing Tag Groups and Tags
- A new admin page is available for managing tag groups and tags (accessible to editors only).
- You can:
- Create, update, and delete tag groups.
- Create, update, and delete tags within each group.
- Each tag includes a title and a unique color per group.
- Deleting a tag group also deletes all its associated tags.


Assigning Tags to Items
- A new “Tags” tab is added to projects, placeholders, notes, and drill stops.
- Tags can be assigned per group — only one tag per group.
- Tags are optional and can be changed or removed.
- Deleted tags or tag groups are automatically unassigned from all items.
- Tag assignments and updates are tracked in the project history.
- Viewers can see all assigned tags.
This feature supports both the main Masterplan and all drafts.

Color Coding by Tag Group
- You can select a tag group to color the Masterplan by, making it easier to distinguish projects by department or other categories.
- The default coloring remains based on the selected crew.
- The legend updates automatically to reflect the selected tag group.
- Items without a tag in the selected group are marked as “Not tagged.”

Update to List of INV Well Engineers
The list of INV well engineers has been updated:
- Unchanged: Jeanette, Morten, Erik, Glenn, Other
- Removed: Newton
- Added: Danny, Thomas, Lasse, Stine

POB Added to Phases
- POB can now be added at the phase level.
- Validation rules are the same as those used for the project-level POB.
- newly added POB at phase-level is now used for data export to Safran

Improved Zoom Functionality
We have added more granularity to the zoom levels, making it easier to view and plan activities across different timeframes.
You can now zoom to:
- 1 month
- 3 months
- 6 months
- 1 year
- 1.5 years
- 2 years

We hope you are pleased with these updates. If you have any questions, experience any issues, or have suggestions for improvements, we would be happy to hear from you.
Updated on: 07/01/2026
Thank you!
