Add, Edit, Move and Delete Rig Step


Add Rig Step


A rig step can be an unplanned activity or delay, that does not require a new Procedure revision. The added Rig step will be displayed with a special rig icon, indicating it is a Rig step and not part of the signed Procedure received from Operator.


  1. To add a rig step, simply press the "Add rig step" button at the bottom of the activity



  1. You then get the option to choose a Regular Rig Step or from a Predefined Rig Step title list, which include:


  • Dropcheck


  • Flowcheck


  • Repair Hydraulic Leaks


  • Time Out


  • Clean & Clear Drillfloor


  • Waiting on Weather


These titles are sorted alphabetically to save you time and effort, as they represent the most commonly needed actions.


  1. If you choose Regular Rig Step, input step title and click "create". You can also add description if needed



Edit Rig Step


  1. To edit a rig step, hover over the desired step and press the pencil icon



  1. Edit the rig step, and when finnished click the "edit" button.



Move Rig Step


  1. To move the rig step, move your mouse to the dots on the left side of the step:



  1. You can drag and drop the rig step to desired place.


Note that you can not move rig step to above started or finnished steps, and you can not move the step to another activity.


Delete Rig Step


  1. Delete the rig step by pressing the trash icon



Note that you can not delete or edit the rig step when it is started or completed.

Updated on: 15/05/2025